The steps, in order
A kitchen renovation follows the same sequence almost every time. Knowing it helps you plan when you'll be without a kitchen.
- Site visit and measurements
- Layout, cabinet design and a written fixed-price quote
- Permits (if walls, plumbing or wiring change)
- Demolition and rough-in: framing, plumbing, electrical
- Inspections
- Drywall, flooring and painting
- Cabinets, counters, backsplash and fixtures
- Final walkthrough and warranty handover
How long it takes
[[TODO: typical duration ranges, cited or reviewed by Saeed. Do not publish unreviewed numbers.]]
Permits and inspections in Coquitlam
Structural, plumbing and electrical changes usually need permits and inspections. Your contractor should tell you at the site visit which apply, and who applies for them.
- [[TODO: City of Coquitlam permit notes, confirmed]]
- Electrical work in BC is done by licensed contractors under Technical Safety BC. [[TODO: Saeed to confirm wording]]
Questions to ask before you sign
- Is the price fixed, and what would change it?
- How are payments tied to finished stages?
- Who is my one point of contact?
- Which trades are licensed, and who pulls the permits?
- What does the warranty cover, and for how long?
Questions
Can I stay in my home during a kitchen renovation?
Usually yes, with a temporary kitchen set up elsewhere in the house and dust barriers around the work area.
Who applies for the permits?
Ask your contractor to say this in writing. We prepare and submit the application for our clients.